Sunday, September 19, 2010

More Finishing Details

Ryan's parents are here this week to help us with all the finishing touches. We are thinking it's possible we could still complete this house by the end of the month. It will be tough! Our plumber showed up Friday and temporarily hooked up one toilet. This is nice, because the porta-john was canceled last week on Friday. However, we are ready for him to begin his final trim, so we're unsure of the point of a "temporary" toilet at this point. All fingers are crossed that he'll actually show up soon to finish.



This is the tub in the master bathroom. The men we hired to finish our tile, Bobby and John, have been wonderful. We can't say enough good things about them.



Here is what they have completed in our shower so far. The waterproofing on the repaired kneewall is still drying.



Ryan installed the vanity in the master bathroom today. It has 2 bowls, and that is the shower on the left. The knee wall is against the left side of the vanity and will be tiled.



This is the countertop. Many thanks to friends Megan, Bobby, and Duncan for helping us today with transporting it from Home Depot to the house on very little notice. It's a solid surface and the color is "Sandstone."

No comments: